Building 101: Lock Up Stage

As luck would have it, J was onsite when I drove by to check on the week’s progress and was the bearer of some exciting news. By the end of today, we will have reached ‘lock up’ stage! What a significant milestone in the building journey!

Now it may surprise you to know that lock up doesn’t actually mean the house is fully “locked up”.  In actual fact, the all important front door, garage door and laundry door are yet to be installed so technically sneaking round the house is still possible 😛

According to our progress payment schedule, lock up is;

“the stage when a house external wall cladding is installed, eaves lining and roof covering is fixed (roof pointing not necessarily complete and front and rear doors not installed).”

Speaking of doors, I spied our long awaited corner bifold doors stacked neatly against the scaffold. J told me they were going in today. Yay!

DSC_0529
The carpenters were putting the final touches to the cladding work and I’m so glad we decided on the Scyon Stria. I can’t wait to see the Stria painted in Dulux Saudi Sand. The rendered portico will be painted in dark grey Dulux Mt Eden so hopefully the contrast works nicely.

DSC_0525

Great sight – a tradie’s ute out the front!

DSC_0526

DSC_0524

J ran me through the schedule and it sounds like all systems go next week.

  • Painters were supposed to start on exterior today but the weather was unfortunately less than ideal so weather permitting, they are booked to work tomorrow (Sat, 18/4) and finish up on (Mon, 20/4)
  • Scaffolding will be removed on Tuesday, 21/4
  • Lower roof guttering, fascia and tiles are scheduled for Wed, 22/4
  • Electrical, AC ducting (Wed, 22/4)
  • Ground floor bricks to be acid washed (Thurs, 23/4)
  • Insulation (Wed, 29/4)
  • Rainwater tanks (Wed, 29/4)
  • Gyprock (tentative start date Fri, 1/5)

Phew! What a lineup! Lets hope the weather gods are good to us and we get everything on the agenda ticked off.

Hope you have an awesome weekend 🙂

6 thoughts on “Building 101: Lock Up Stage

  1. trixee says:

    How exciting!! I can’t wait to see that scaf come down, not long to go now! It’s good that you can still sneak in though 🙂

  2. monalisa says:

    Wow Sheilzy! Your build has come a long way! so hopefully 10 weeks from now you may be all settled in your new home. So lucky!

  3. debdjd says:

    It’s looking great Sheilzy and really does seem to be moving along rapidly.
    I found the term ‘lock up’ very confusing as thought all the doors would be in and access would be limited as it was our house was only completely locked up on April 1st.
    Count down!!

  4. lunar62 says:

    Lock up 🙂 another milestone!
    Even better getting to actually speak to your SS and get an update. It really is all systems go on your build.
    I’m looking forward to your gyprock and really getting a feel for your lovely home.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s